McNeese Homepage Contact Us
MSU Home
Contact Link ADA  |   Contact Link contact  |   Homepage Link home
Prospective Students Current Students Faculty & Staff Alumni & Community
  COLLEGE of E&ET −> LAI/MEP   QUICK LINKS
spacer

College of Engineering and Engineering Technology

Lake Area Industries/McNeese Engineering Partnership

Workshop History

You can CLICK on the active links under the "Topic" column to view the flyer used to announce the workshop in a PDF format.

Number

Topic

Date

77

Control Valve Sizing and Selection

November 5, 2009

76

Heat Transfer / Combustion Fundamentals with Applications

Sept 16, 2009

75

Pump Selection and Operation

August 26 - 27, 2009

74

Vibration Analysis and Machine Fault Diagnostics

July 14, 2009

73

Process Troubleshooting

February 2 - 4, 2009

72

Electrical Engineering for non-Electrical Engineers

January 8, 2009

71

Flow Measurement Technologies

October 2 - 3, 2008

70

Fired Process Heaters

September 23 - 25, 2008

69

Advanced Project Management

April 8 - 10, 2008

68

ACI 318 Reinforced Concrete Design

March 11 - 12, 2008

67

Process Troubleshooting

February 11 - 13, 2008

66

Process Piping to ASME B31.3 - Design, Construction and Mechanical Integrity

October 1 - 3, 2007

65

Process Troubleshooting

September 11-13, 2007

64

Motor and Drive Applications

August 29-30, 2007

63

SIS Operational Requirements

May 15-16, 2007

62

Pressure Vessel Design and Analysis

December 6-7, 2006

61

Control Valves

Sept 13-14, 2005

60

Project Management

August 30-31, 2005

59

Life Safety Code

Dec 14-15, 2004

58

Compressor & Surge Control Technology

Sept 30-Oct 1, 2004

57

Distillation

August 24-25, 2004

56

Electrical Engineering for Non-EE's

March 23, 2004

55

SIS Implementation & SIL Verification

October 6-8, 2003

54

Pump Selection, Operation, Maintenance & Reliability

Sept 22-23, 2003

53

Distillation

April 8-9, 2003

52

Project Management

Dec 17-18, 2002

51

Heat Exchangers

Oct 22-23, 2002

50

Root Cause Failure Analysis/Enhanced Investigation

June 4-5, 2002

49

Heater-Burner Optimization

April 16-17, 2002

48

Cogeneration and Deregulation of the Electric Utility Industry in LA

Nov 6 - 7, 2001

47

Integrating Reliability into Engineering Standards

July 19, 2001

46

Damage Mechanisms / Non-Destructive Evaluation

April 24-25, 2001

45

ANSI/ISA S84.01 Design, Evaluation, Reliability of Safety Instrumented Systems

April 17-18, 2001

44

Fixed Equipment Reliability Workshop

November 14, 2000

43

Centrifugal Pumps: Selection, Operation, & Maintenance

Sept 27-29, 2000

42

Trends in Automation/Fieldbus Technology

May 25, 2000

41

PMP Test Preparation Seminar

Feb 28-29, 2000

40

Compressors: Selection, Operation & Maintenance

Nov 30-Dec 1, 1999

39

Instrumentation Reliability & Maintenance

Oct 12-13, 1999

38

Managing Multiple Small Projects/Project Estimation

May 25-26, 1999

37

Reliability Workshop (Instrumentation)

May 11, 1999

36

Equipment Reliability

February 4-5, 1999

35

Reliability Workshop

Nov 5, 1998

34

Heat Exchangers in the Process Industries (#2)

Sept 29-30, 1998

33

Equipment Reliability (Soloman Associates on Steam)

May 12, 1998

32

Refractory Design & Maintenance

April 20-22, 1998

31

How to Get the Most From Your Distillation System (2)

April 20-21, 1998

30

How to Get the Most From Your Distillation System (1)

February 3-4, 1998

29

Design & Evaluation of Safety Shutdown Systems

December 12, 1997

28

Liquid/Gas Flow Control & Measurement Devices

Oct 21-23, 1997

27

Equipment Inspection for Mechanical Integrity

May 28-31, 1997

26

Application of High Efficiency Motors & Variable Speed Drives

April 22-23, 1997

25

Piping Design & Stress Analysis per ASME B 31.3

Sept 17-19, 1996

24

Guidelines for Safe Process Operations & Maintenance

May 15-16, 1996

23

Economic Evaluation, Analysis & Project Management

March 26-28, 1996

22

Chemical Engineering for Non-Chemical Engineers

Oct 25-27, 1995

21

EPA's Risk Management Program

Sept 25-28, 1995

20

Industrial Wastewater Treatment (#2)

July 26-27, 1995

19

Process Equipment Integrity

May 3-4, 1995

18

ISO 9000 Quality Assurance Standards

Nov 17-18, 1994

17

Programmable Controller Applications

Oct 17-19, 1994

16

Process Safety Management

June 27-29, 1994

15

Pump Selection: Operation & Maintenance (#2)

Feb 9-11, 1994

14

NACE Basic Corrosion Course

Sept 15-17, 1993

13

Pressure Release Valves/Rupture Discs:Selection-Maintenance

May 10-12, 1993

12

Machinery Vibration Analysis

March 2-5, 1993

11

Distributed Process Control Systems (#2)

Nov 18-20, 1992

10

Environmental Laws for Industry

Sept 23-25, 1992

9

OSHA Process Safety: Compliance with 29 CFR 1910.119

April 29-May 1, 1992

8

Heat Exchangers in the Process Industry (#1)

Feb 26-28, 1992

7

Process Simulation: Overview of Hysim

Nov 7-8, 1991

6

Construction Project Management (From Owner's Viewpoint)

Sept 25-27, 1991

5

Principles of Project Management

May 1-3, 1991

4

Pump Selection, Operation & Maintenance (#1)

Feb 25-27, 1991

3

Distributed Process Control Systems

Nov 7-9, 1990

2

Project Management & Evaluation

Sept 20-21, 1990

1

Industrial Wastewater Treatment for the 1990s

May 3-4, 1990

 

4205 Ryan Street, Lake Charles, LA 70609
337.475.5000 | 800.622.3352 | E-Mail: webmaster@mcneese.edu
McNeese Web Page Disclaimer | McNeese Policy Statements |
© 2009 McNeese State University
University Status & Emergency Preparedness

Text Only Version
Web Server Courtesy of TASC
A Member of The University of Louisiana System